Michigan · Detroit
Detroit Oversize & Overweight Permits for city streets, county roads and the crossings to Canada
Three road owners share Detroit. MDOT has the freeways and state routes such as Fort Street and Michigan Avenue, Wayne County has roads such as Dix, Wyoming and Miller, and every other street belongs to the City of Detroit, where an oversize or overweight load needs the DPW City Engineering heavy hauler permit. A move to Windsor adds the rules of the bridge it crosses. Tell us the pickup, the delivery and the load, and we sort the route by road owner and file each permit on it.
Who issues what
One move through Detroit, up to 4 permits
Each road owner issues its own permit. We check the route and file with every one of them.
- State highways
MDOT
Oversize & overweight permit - City streets
Detroit DPW City Engineering
City street permit - County roads
Wayne County Roads Division
County road permit - Bridges and tunnels
Ambassador Bridge
Bridge and tunnel escort
Detroit rules
What the city permit and the border crossings ask for
The details City Engineering takes with an application, and the limits each Detroit River crossing publishes for heavy and oversized trucks.
Filed with the city application
- Route
- Starting point, destination and every street between them
- Load
- Description, number of loads, overall width, height and length
- Axles
- Loaded weight, tire count and width per axle, and each axle spacing
- Vehicle
- Make, model, year, VIN and plate
- Bond
- Uniform surety bond under Chapter 46 of the Detroit City Code, expiring December 31
Gordie Howe International Bridge
- Notice
- At least 24 hours before crossing
- No oversize travel
- 7–9 a.m. and 3–6 p.m. Eastern
- Maximum height
- 17.3 ft; 16.4 ft under the hazmat canopy
- Permits
- MDOT and/or Ontario MTO, carried on board
- At the port
- Check in first, far right inspection lane, no holding area
Detroit-Windsor Tunnel
- Maximum width
- 8 ft 6 in
- Maximum height
- 12 ft 8 in
- Maximum weight
- 144,000 lbs
- Placarded hazmat
- Not allowed
Source: City of Detroit Department of Public Works City Engineering oversize/overweight load move requirements and traffic application, Detroit City Code Chapter 46, City of Detroit Southwest Detroit truck restrictions; Michigan Vehicle Code MCL 257.725; MDOT; Wayne County Roads Division weighmaster and transportation permits; Windsor-Detroit Bridge Authority; Detroit International Bridge Company; Detroit Windsor Tunnel; Detroit/Wayne County Port Authority.
Detroit roads
Detroit corridors that shape a permit route
Where a Detroit route changes road owner, meets a truck ban or reaches the border.
Southwest Detroit truck ban
Since October 6, 2025, trucks stay off Livernois and Dragoon between Vernor and the I-75 Service Drive, Clark, Scotten and West Grand Boulevard between Toledo and the Service Drive, and the residential streets between Vernor, the Service Drive and Woodmere.
Allowed:Local business deliveries, and the city's approved routes: Fort Street, Michigan Avenue, John Kronk, Dix, Wyoming and Miller.
Fort Street and Michigan Avenue
M-85 and US-12 run through the city as MDOT roads, while Dix, Wyoming and Miller nearby are Wayne County's, so a short Southwest Detroit leg can cross three jurisdictions.
We check:Who owns each segment before a single permit is filed.
I-75 to the Gordie Howe bridge
Oversize loads don't cross the new bridge from 7 to 9 a.m. or 3 to 6 p.m., the same hours when MDOT permits are not valid in Wayne County.
Clearance:17.3 ft is the bridge's ceiling, 16.4 ft under the hazmat canopy.
Downtown and the tunnel
The Detroit-Windsor Tunnel takes trucks only up to 8 ft 6 in wide and 12 ft 8 in high, so any wide or tall load goes to Windsor over a bridge.
Then:We route the city leg to the crossing that fits the load.
Detroit freight
Where oversize freight moves in Detroit
NT&D Detroit Terminal, Delray
The port authority's own terminal on the Detroit River, where steel, aluminum, cement and project cargo are handled for Southeast Michigan manufacturing.
Livernois Junction Intermodal Terminal
The city counts more than 1,200 truck trips a day here, and trucks reach it on approved routes, with I-94 at Livernois the recommended access.
How it works
Your Detroit permit in three steps
Send the load and route
Truck, trailer, dimensions, weight, origin and destination. Your fleet details are saved for next time.
We check and file
Our permit desk checks the Detroit rules for your load and files with Detroit DPW City Engineering, Wayne County Roads Division, Ambassador Bridge and MDOT.
Get your permit
You get the permit PDF, a written route and an interactive route map to share with the driver.
From our permit desk
How we put together a Detroit permit set
Road owner by road owner
We split the route into MDOT, Wayne County and city segments, then file each authority's permit for its own piece of the trip.
Axle sheet done right
The city application asks for weight, tires and spacing axle by axle, and a load over those figures voids the permit, so we build that sheet from your actual rig.
Bond and vehicle on file
City Engineering wants a current surety bond that runs to December 31 and each truck registered. We check both before the permit goes in.
The border on the same schedule
For a load headed to Windsor, we book the Gordie Howe notice or the Ambassador Bridge escort to match the permit dates and the rush-hour stops.
Oversize & Overweight Permit Cost Calculator
Enter your pickup and delivery locations, choose your permit type, and compare estimated permit costs across route options.
- Oversize and overweight permits across the lower 48 and DC
- State-by-state fee breakdown for each route option
- Order your permit or talk to a specialist
FAQ
Detroit permit questions
Does my MDOT permit cover the last mile to a Detroit plant?
Only while the route stays on state trunklines such as the freeways, Fort Street or Michigan Avenue. Once it turns onto a city street it needs the DPW City Engineering permit, and on a Wayne County road the county permit. We file whichever ones your route touches.
Which Detroit roads belong to Wayne County?
The city itself lists Dix, Wyoming and Miller as Wayne County roads in Southwest Detroit. We check every road on your route against the jurisdiction map before filing, so no county segment goes unpermitted.
Can an oversize truck take Livernois or Clark to the I-75 Service Drive?
No. Southwest Detroit bans trucks on those streets and on Dragoon, Scotten and West Grand Boulevard near I-75, except for local deliveries. We route the load over Fort Street, Michigan Avenue, John Kronk, Dix, Wyoming or Miller instead.
What does the Gordie Howe bridge require from an oversize load?
MDOT and/or Ontario permits on board, notice to the bridge at least 24 hours ahead, a check-in at the port of entry and no travel 7–9 a.m. or 3–6 p.m. The height ceiling is 17.3 ft. We handle the notice along with the permits.
Can a wide load go through the Detroit-Windsor Tunnel?
No. The tunnel caps commercial trucks at 8 ft 6 in wide and 12 ft 8 in high. A wide or tall load crosses on the Gordie Howe or Ambassador Bridge, and we plan the city route to that crossing.
What does City Engineering need to issue a Detroit permit?
The full route, the load and vehicle details, axle weights and spacings, a surety bond on file and each vehicle registered with the city. We gather it from you and submit the complete application.
What sets the price of a Detroit permit package?
Whether the trip is one-way or round trip, how many road owners the route crosses, the load's size and weight, a Wayne County superload, and any bridge notice or escort. We quote the whole package before we file.
Keep going
More on truck permits
Michigan
24/7 permit desk
Need a permit in Detroit for this load?
Send the details once. We file with Detroit DPW City Engineering, Wayne County Roads Division, Ambassador Bridge and MDOT, plus every other state on your route.