Colorado · Denver
Denver Oversize & Overweight Permits for the streets of the City and County of Denver
Denver is a consolidated city and county, so one local authority covers every Denver street: the Department of Transportation and Infrastructure (DOTI), which issues the Special Moving Permit for oversize and overweight loads. Its height threshold is 13 ft 6 in, a foot under the state's, so a load that runs legal on a CDOT highway can still need a city permit after the exit. CDOT keeps the state highways. Give us the pickup, the delivery and the load, and we file the Denver permit and the CDOT one your route needs.
Who issues what
One move through Denver, up to 2 permits
Each road owner issues its own permit. We check the route and file with every one of them.
- State highways
CDOT
Oversize & overweight permit - City streets
City and County of Denver DOTI
City street permit
Denver rules
Where the Denver permit starts and what each class asks for
The thresholds in DOTI's entrance requirements for special moves, and the limits on the current special moving permit application.
No city permit needed up to
- Width
- 8 ft 6 in
- Height
- 13 ft 6 in
- Gross weight
- Under 85,000 lbs
- Single axle
- Under 20,000 lbs
Class A and Class B on Denver roads
- Class A size
- Up to 15 ft high, 14 ft wide or 100 ft long
- Class B size
- Up to 22 ft high, 36 ft wide or 130 ft long
- Freeways
- Class B not allowed
- I-25, I-70 to I-225
- No oversize move over 13 ft high; handled through CDOT
- Same stretch, application form
- No loaded vehicle wider than 14 ft
Filing with DOTI
- Route
- Origin, destination and the streets between them
- Review
- At least 10–14 business days
- Permit types
- Oversize, overweight or combined
Source: City and County of Denver Department of Transportation and Infrastructure, Permit Operations special moving entrance requirements for oversize and overweight moves and special moving permit application; Colorado Revised Statutes Title 42, Article 4, Part 5; CDOT; Denver International Airport.
Denver roads
Denver routes where the permit picture changes
Where a Denver move switches from CDOT rules to city rules, or meets a limit of its own.
I-25 between I-70 and I-225
Denver's entrance requirements bar any oversize move over 13 ft high from this stretch of I-25 and refer it to CDOT, well under the state's 14 ft 6 in legal height.
We check:The load's true loaded height before the route goes through central Denver.
Off I-70 and I-225 onto city streets
At the exit the load leaves the CDOT permit and enters city jurisdiction, where the 13 ft 6 in threshold applies. A 14 ft load that needed no state permit needs the Denver one.
Then:We file the city permit for the leg from the ramp to the site.
Freeways and Class B loads
Denver's entrance requirements keep a Class B load, anything past 15 ft high, 14 ft wide or 100 ft long, off the freeways entirely.
Result:We route a Class B load over surface streets from the city line to the site.
Denver freight
Where oversize freight meets Denver streets
Denver International Airport cargo facilities
The city-owned airport runs cargo and general aviation facilities beside its terminal and three concourses, with FedEx, UPS and DHL among the cargo carriers.
How it works
Your Denver permit in three steps
Send the load and route
Truck, trailer, dimensions, weight, origin and destination. Your fleet details are saved for next time.
We check and file
Our permit desk checks the Denver rules for your load and files with City and County of Denver DOTI and CDOT.
Get your permit
You get the permit PDF, a written route and an interactive route map to share with the driver.
From our permit desk
How we line up a Denver permit
Measured against the city, not the state
Colorado lets 14 ft 6 in run legal, Denver starts at 13 ft 6 in. We measure your load against both before saying a permit isn't needed.
Class chosen before the route
Class A or Class B decides whether the freeways are open to the load at all, so we classify the load from its real dimensions first and draw the route after.
Two weeks on the calendar
DOTI reviews a special move for at least 10 to 14 business days. We file as soon as your dates are set.
Height and width on central I-25
Between I-70 and I-225 the city form stops a loaded vehicle over 13 ft high or 14 ft wide. We check both numbers before that stretch goes on the route.
Oversize & Overweight Permit Cost Calculator
Enter your pickup and delivery locations, choose your permit type, and compare estimated permit costs across route options.
- Oversize and overweight permits across the lower 48 and DC
- State-by-state fee breakdown for each route option
- Order your permit or talk to a specialist
FAQ
Denver permit questions
My load is 14 ft high and legal on CDOT highways. Why would Denver want a permit?
Because the city's threshold is lower. DOTI's entrance requirements generally let a load move without a Special Moving Permit only up to 13 ft 6 in high and 8 ft 6 in wide. Above that, the Denver streets on your route need the city permit, and we file it.
Is the Denver permit only for wide and tall loads, or heavy ones too?
Both. Under 85,000 lbs with every single axle under 20,000 lbs, a truck needs no overweight permit from the city, though its size can still call for an oversize one. Past those weights, DOTI issues the overweight or the combined permit.
What separates a Class A move from a Class B move in Denver?
Size. Class A goes up to 15 ft high, 14 ft wide or 100 ft long, Class B up to 22 ft, 36 ft or 130 ft. Class B is kept off the freeways, which changes the whole route. We tell you the class before we route.
Can a tall load take I-25 through central Denver?
Not over 13 ft between I-70 and I-225. Denver refers those moves to CDOT, so we plan the route and the state permit around that stretch.
How far ahead should a Denver special move be filed?
DOTI asks for at least 10 to 14 business days to review. Send us the load early and we file the application as soon as your details are complete.
What drives the cost of a Denver permit job?
Oversize, overweight or both, the class of the move, how much of the route runs on city streets and whether a CDOT permit rides along. We quote everything up front, before anything is filed.
Keep going
More on truck permits
Colorado
24/7 permit desk
Need a permit in Denver for this load?
Send the details once. We file with City and County of Denver DOTI and CDOT, plus every other state on your route.